A Rowan company - serving Sherman Oaks, CA
Rowan Construction Group Sherman Oaks construction team

Kitchen Remodel Cost - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Much Does a Kitchen Remodel Cost in Sherman Oaks?

A kitchen remodel in Sherman Oaks, CA typically costs between $14,000 and $45,000, depending on kitchen size, cabinet and countertop selections, and whether the layout changes. Most mid-range full remodels in the area land between $22,000 and $32,000 when cabinets, countertops, appliances, and tile are all replaced but walls stay in place. At Rowan Construction Group, every project in Sherman Oaks starts with a flat written price and a written scope before a single tool comes out – that number is what you pay, not a starting point.

Kitchen Remodel Cost Breakdown (2026)

Sherman Oaks sits in a mid-to-upper price band for Los Angeles County labor. Permit fees through the City of Los Angeles Building and Safety Department add $800 to $2,000 to most full remodels – a cost some contractors bury in their bid and others omit entirely, leaving it as a surprise. The table below names each line item separately so you can compare any quote you receive against real market numbers.

Scope Sherman Oaks Price Range (2026)
Full Kitchen Remodel $14,000 - $45,000
Small Kitchen Remodel $9,000 - $20,000
Cabinet Installation $4,000 - $13,000
Countertop Installation $2,000 - $6,500
Backsplash Installation $800 - $2,500
Kitchen Island Installation $3,000 - $10,000
LA City Permits (typical range) $800 - $2,000

Cabinets are consistently the largest single line item in a Sherman Oaks kitchen remodel, accounting for 35 to 45 percent of a typical mid-range budget. Rowan sources from KraftMaid and Wellborn, two brands that give us honest lead times and consistent box dimensions – which matters when the walls in older Sherman Oaks homes from the 1950s and 1960s are not always perfectly plumb. Countertops from Cambria or Caesarstone run $2,000 to $6,500 installed, with the spread driven almost entirely by slab thickness, edge profile, and square footage. Laminate countertops can bring that number down to $900 to $1,800, and for rental properties or transitional flips in the Ventura Boulevard corridor, that trade-off sometimes makes sense.

Labor rates in Sherman Oaks reflect the San Fernando Valley’s competitive but experienced subcontractor market. A licensed tile setter here charges more per square foot than in the Antelope Valley and less than in Santa Monica – that’s just where Sherman Oaks sits geographically and economically. Demo, haul-away, and substrate prep are real costs that cut-rate bids often strip out. When you see a quote below $12,000 for a full kitchen replacement in Sherman Oaks, ask whether it includes permit fees, demo, and haul-away – those three items alone can total $2,500 to $4,500.

What Affects Kitchen Remodel Pricing in Sherman Oaks

Two professional contractors installing upper kitchen cabinets during a home remodel
What Affects Kitchen Remodel Pricing in Sherman Oaks
  • Layout changes and plumbing moves: Keeping the sink on the same wall saves $1,500 to $4,000 in rough plumbing costs. Sherman Oaks homes built in the postwar era often have cast-iron drain lines under the slab, and relocating a drain means breaking concrete – a cost that should appear on any honest written scope.
  • Cabinet grade and construction: Stock cabinets run $80 to $200 per linear foot installed; semi-custom (like KraftMaid) run $150 to $350; full custom cabinets start around $400 per linear foot and can exceed $1,000. A 15-foot kitchen wall in a typical Sherman Oaks home spans the difference between a $4,000 and a $15,000 cabinet budget before handles and hardware.
  • Countertop material: Quartz (Cambria, Caesarstone) and quartzite are the most requested surfaces in the Ventura Boulevard zip codes right now. Granite runs slightly less; butcher block runs less still. The material cost difference between a basic tile countertop and a 3cm Cambria quartz slab on the same kitchen can exceed $3,000.
  • Appliance package: Rowan’s written scope can include appliance procurement and installation or exclude it entirely – the customer’s choice. A basic package (range, dishwasher, refrigerator space) from mid-tier brands adds $3,000 to $6,000; a professional-grade package with a 36-inch range and built-in refrigerator adds $12,000 to $25,000 before installation. We write both into the scope clearly so there’s no confusion about what’s in the number.
  • Permit requirements under LA City Building Code: Sherman Oaks falls under the City of Los Angeles jurisdiction, not LA County. Any electrical panel upgrade (common in 1960s homes where the original panel can’t support modern appliances), gas line modification, or structural wall removal requires a permit, inspection, and a licensed engineer’s stamp if load-bearing walls are involved. Skipping permits to save $1,200 creates title and insurance problems that cost far more at resale.
  • Existing conditions behind the walls: In Sherman Oaks’s older neighborhoods – particularly the streets south of Ventura between Sepulveda and Hazeltine – we regularly find tile set directly on drywall with no cement backer board, original knob-and-tube wiring in kitchen cavities, and galvanized supply lines that need replacement. A documented photo record on every visit means the customer sees exactly what we found, in writing, before we proceed. That’s included in every Rowan project, not an upgrade.
BeforeBefore
AfterAfter

Sherman Oaks Kitchen Remodel: What the Tiers Actually Look Like

Price ranges only mean something when you can picture what they buy. Here’s how the budget breaks down at three realistic tiers for a standard Sherman Oaks kitchen – approximately 120 to 180 square feet, the size that appears most often in the single-family homes and condominium units in this market.

Entry-Level Remodel: $14,000 - $20,000

At this budget, you’re replacing cabinets with stock-grade boxes, installing a laminate or lower-cost quartz countertop, swapping out the sink and faucet, updating the backsplash, and replacing flooring. Appliances are usually owner-supplied. The layout stays exactly where it is – sink wall, refrigerator alcove, everything. This tier works well for Sherman Oaks rental properties or condos in the Magnolia Park adjacent area where the goal is durable and updated rather than custom.

Mid-Range Remodel: $21,000 - $32,000

This is the most common scope we write for Sherman Oaks homeowners. Semi-custom cabinets from KraftMaid or Wellborn, a Cambria or Caesarstone countertop, subway or mosaic tile backsplash, a new undermount sink and Kohler or Moen faucet, recessed lighting, and updated electrical to handle modern appliance loads. Minor layout adjustments (like extending the island or adding a pantry cabinet) are possible without a permit if no plumbing or gas moves. This range also typically covers the permit, demo, haul-away, and a new LVP or tile floor.

Premium Remodel: $33,000 - $45,000

Custom or semi-custom cabinetry to the ceiling, a 3cm Cambria or natural stone countertop with a waterfall edge, full layout reconfiguration, pot-filler rough-in, under-cabinet lighting, a professional appliance package, and sometimes a kitchen island where none existed. At this level in Sherman Oaks, we’re also frequently opening up the wall between the kitchen and the dining room – which requires a structural engineer’s letter, a City of LA permit, and a temporary support beam during demo. That process adds two to three weeks to the timeline and $3,000 to $6,000 to the cost, but it shows up on the written scope before anyone signs.

How to Save on a Kitchen Remodel in Sherman Oaks

Contractor installing a white stone countertop during a kitchen remodeling project.
How to Save on a Kitchen Remodel in Sherman Oaks

There are real savings available on a Sherman Oaks kitchen remodel, and most of them come from decisions made before demo starts – not from hiring an unlicensed crew.

  • Keep the plumbing where it is. Every sink or dishwasher drain that moves requires a plumber, a permit inspection, and sometimes concrete cutting. If the layout lets you keep the sink on the exterior wall with existing drain access, that decision alone saves $2,000 to $4,000.
  • Choose semi-custom over full custom. KraftMaid and Wellborn both offer finish options and box configurations that cover 95 percent of what Sherman Oaks homeowners want in a kitchen. Full custom cabinetry is beautiful and has its place, but the price premium is real – $150 per linear foot versus $400-plus. For most projects, semi-custom closes the gap visually at a fraction of the cost.
  • Stage the work if the budget requires it. Nothing in the contract requires countertops and backsplash to go in at the same time as cabinets. Rowan will write a phased scope when the customer asks for one – cabinets and substrate now, countertops and tile in 90 days – with written prices on both phases before either starts. The second phase typically costs the same or less because the rough work is already done.
  • Get a second opinion on any written estimate. Rowan offers a free line-by-line review of any competitor’s written quote – no charge, no obligation. Bring the document and Grant Rowan will walk through it with you. This isn’t a sales tactic; it’s how we show our work. If the competing quote is better, we’ll tell you why. If it’s missing line items, you’ll know before you sign.
  • Avoid scope creep with signed change orders. The fastest way a $22,000 remodel becomes a $31,000 remodel is verbal approvals on changes. Under The Haven Standard, no additional work proceeds without a signed change order in hand – a documented number, not a text message. That discipline has kept Rowan’s projects within a few percent of the agreed cost across more than 4,000 jobs since 2007.
  • Request a free written estimate early. The written estimate from Rowan is a flat price with a written scope – not a “starting from” range. Call (213) 221-0788 and that document is yours before any commitment. Comparing flat written prices from two or three contractors is the most reliable way to understand the Sherman Oaks market rate for your specific kitchen.
Get the price in writing before anything starts.A real person answers, day or night.
Call now

The Sherman Oaks Market: What We See On-Site

Sherman Oaks is not a uniform market. The single-family homes on the hillside streets north of Ventura – the neighborhoods that climb toward Mulholland – tend to be larger, often with kitchens that haven’t been touched since the 1980s, and they frequently have original aluminum wiring that needs remediation before any new circuit runs. The flatter streets south of Ventura, particularly around Kester and Sepulveda, have a higher density of 1960s ranch homes where the kitchen sits at the center of the floor plan, and opening it up to the living room is a common request.

Condominiums in the Ventura Boulevard corridor – many built in the 1970s and 1980s – have their own set of constraints. HOA approval is required before demo begins on most condo remodels, and some HOA CC&Rs restrict work hours to weekdays between 8 a.m. and 5 p.m. Those constraints go into the written schedule before work starts. We’ve also seen, specifically in the multi-story units near Van Nuys Boulevard, that the original kitchen plumbing was routed through a shared wall – which means a licensed plumber needs to coordinate the drain work, not just a general contractor’s helper.

The City of Los Angeles Building and Safety Department – the permitting authority for Sherman Oaks – has moved most residential permit applications to the LADBS online portal. Simple permits for electrical and plumbing work in kitchens can be issued over-the-counter in days; structural permits for load-bearing wall removal take longer and require stamped engineer drawings. A contractor who tells you permits aren’t necessary for a full kitchen gut remodel in Sherman Oaks is either uninformed or hoping you don’t ask. Rowan pulls every required permit and includes the cost in the written price.

If you’re early in your research, the Kitchen Remodel in Sherman Oaks service page covers scope options, material selections, and the full Rowan process in more detail. And if you want to understand how a kitchen remodel fits alongside other projects – like a bathroom remodel, a room addition, or an ADU – the Rowan Construction Group home page lists every trade we cover with the same written-price guarantee.

FAQs – Kitchen Remodel Cost in Sherman Oaks

professional contractor installing subway tile backsplash in kitchen remodeling project
FAQs – Kitchen Remodel Cost in Sherman Oaks

What is the average cost of a kitchen remodel in Sherman Oaks, CA?

The average full kitchen remodel in Sherman Oaks runs $22,000 to $32,000 for a mid-range scope – new semi-custom cabinets, quartz countertops, tile backsplash, updated electrical, new flooring, and a permit. Entry-level work (stock cabinets, laminate surfaces, layout unchanged) can come in between $14,000 and $20,000. A premium remodel with custom cabinetry, a professional appliance package, and a layout reconfiguration typically lands between $33,000 and $45,000. Call (213) 221-0788 for a free written estimate specific to your kitchen’s size and condition.

Is it cheaper to reface cabinets or replace them?

Cabinet refacing in Sherman Oaks runs $2,500 to $6,500 for a standard kitchen, compared to $4,000 to $13,000 for full cabinet installation. Refacing makes sense when the box structure is sound and square – no soft floors, no water damage at the base, no warped frames. In Sherman Oaks homes from the 1950s and 1960s, we frequently find particleboard-base cabinets that have absorbed moisture from years of dishwasher steam; in those cases, refacing a structurally weak box costs more in the medium term than replacing it. A written scope from Rowan will identify the condition of the existing boxes before any price is committed.

How long does a kitchen remodel take in Sherman Oaks?

A mid-range full kitchen remodel in Sherman Oaks typically takes three to six weeks from demo to final inspection, assuming cabinets are ordered and on-site before demo starts. The timeline extends if semi-custom cabinets are ordered during the design phase (add four to eight weeks for fabrication and delivery) or if a City of LA structural permit is required for a wall removal (add two to four weeks for plan check). Rowan provides a written schedule alongside the written price, so the customer knows the sequence before signing.

Do I need a permit for a kitchen remodel in Sherman Oaks?

Yes, in most cases. Sherman Oaks falls under City of Los Angeles jurisdiction. Cosmetic work – painting, hardware swaps, faucet replacement – does not require a permit. But any electrical circuit upgrade, new lighting circuit, gas line relocation, plumbing rough-in change, or structural wall removal requires a permit from the LADBS. Skipping permits on work that requires them creates disclosure obligations at sale and can void homeowner’s insurance coverage on a related claim. Rowan pulls every permit the scope requires and includes that cost in the written price.

Can I get a written price before committing to a kitchen remodel with Rowan?

Yes – that’s the starting point, not a special request. Under Clause 1 of The Haven Standard, a written flat price with a written scope is delivered before any work begins, on every project. The estimate is free. No work proceeds on a change without a signed change order. And the 365-Day Done Right Promise applies from the day the project closes: if something is not right, Rowan makes it right. Call (213) 221-0788 to schedule your estimate, or bring a competitor’s written quote and Grant Rowan will review it line by line at no charge.

What is the most expensive part of a kitchen remodel?

Cabinets are typically the largest single cost in a Sherman Oaks kitchen remodel, accounting for 35 to 45 percent of a mid-range budget. In a $25,000 remodel, cabinets and their installation might represent $9,000 to $11,000 of that number. Countertops are the second-largest line item at $2,000 to $6,500 depending on material. Labor – demolition, rough work, tile setting, finish carpentry – is the third. The ratio shifts at the premium tier, where appliances can exceed cabinets in cost if a professional-grade package is selected.

What should I ask a contractor before signing a kitchen remodel contract in Sherman Oaks?

Ask for a flat written price (not a range), a written scope that names materials by brand and specification, a permit plan that identifies which permits will be pulled and at what cost, and a change-order policy in writing. Also ask what happens if demo reveals a problem – like a corroded drain line or an undersized panel – and how that cost is documented and approved. At Rowan, those answers are in the contract before anyone starts: written price, written scope, signed change orders for any addition, and a documented photo record on every visit so the customer has evidence of what was found and what was done.

Key Takeaways: Kitchen Remodel Costs in Sherman Oaks (2026)

  • Full kitchen remodel in Sherman Oaks: $14,000 - $45,000, with most mid-range projects landing between $22,000 and $32,000.
  • Cabinets are the largest single line item – 35 to 45 percent of most budgets. Semi-custom (KraftMaid, Wellborn) closes most of the gap with full custom at significantly lower cost.
  • City of LA permits are required for electrical, gas, plumbing, and structural work in Sherman Oaks. Budget $800 to $2,000 for permits on a full remodel.
  • Keeping plumbing in place saves $2,000 to $4,000. Moving a drain under a slab in a Sherman Oaks postwar home means concrete cutting – that cost belongs on the written scope before you agree to it.
  • A written flat price, a written scope, and signed change orders are the three things that keep a remodel on budget. Rowan has operated that way since 2007, across more than 4,000 projects.
  • The 365-Day Done Right Promise and a free second opinion on any written estimate are standing offers – call (213) 221-0788 to use either one.

Get a Free Written Estimate for Your Sherman Oaks Kitchen

Contractor installing a level stone shelf for a bathroom shower niche
Get a Free Written Estimate for Your Sherman Oaks Kitchen

If you’re planning a kitchen remodel in Sherman Oaks and want a flat written price before anything else happens, call Rowan Construction Group at (213) 221-0788. A live person answers every call. Grant Rowan leads every estimate personally, and the written price you receive is the number – not a starting point. If you already have a written quote from another contractor, bring it and we’ll review it line by line at no charge. No obligation, no pressure, just the numbers in writing so you can make an informed decision.

Pricing reflects the Sherman Oaks market as of 2026. Rowan Construction Group Sherman Oaks offers free estimates – call (213) 221-0788.

Written by Grant Rowan, Owner at Rowan Construction Group, serving Sherman Oaks since 2007.

What Our Customers Say

★★★★★ 4.7 from 7+ reviews

"Good communication throughout. Weekly written update meant I never had to chase them."

- Nadine G.

"Final invoice was within two percent of the contract. Every change was priced and signed before anyone picked up a tool."

- Malcolm T.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.
Need Construction help in Sherman Oaks? Licensed & insured · Written quotes before work starts response · free estimates
Call (213) 221-0788

Request a Free Estimate

Tell us what's going on in Sherman Oaks - we'll get back to you fast. No obligation.

When you send us your details, you acknowledge our Privacy Policy and authorize us to contact you by call, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Call Now - Fast Dispatch
Local Service Coverage
Call Now - Fast Dispatch