Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Driveway & Pavers: The Sherman Oaks Owner’s Guide
KraftMaid-compatible driveway and paver systems in Sherman Oaks typically run $7,000-$18,000 installed for paver driveways and $3,500-$11,000 for paver patios, with most replacement parts available same-day through our network. We stock common KraftMaid-adjacent hardscape components - edge restraints, permeable joint sand, and matching paver units - because Sherman Oaks homeowners with KraftMaid kitchen or bath installations often extend the brand’s aesthetic into outdoor living spaces. Most owners discover a failure when pavers shift after winter rains or when the polymeric sand washes out from the steep grades common near the Santa Monica Mountains foothills.
Which KraftMaid Models This Applies To
KraftMaid does not manufacture driveway or paver products directly. The connection we see in Sherman Oaks is homeowners who’ve installed KraftMaid cabinetry indoors and want hardscape materials that complement those interior finishes - matching earth tones, consistent edge profiles, or coordinated hardware finishes. We source Belgard and Techo-Bloc pavers that pair with KraftMaid’s current color palette: the warm greiges of their Kingston and Dover door styles, the deeper tones of their Cherry cabinetry line.
To identify what you need, check any existing paver specifications from your original installer. Look for the ICPI (Interlocking Concrete Paver Institute) rating stamped on the paver edge, measure the exact thickness - 60mm for pedestrian areas, 80mm for driveways - and note the joint width, which determines whether you need traditional sand or polymeric compound. The OEM-versus-aftermarket question here is really brand-versus-generic: we use Belgard’s Catalina line or Techo-Bloc’s Eva as our standard equivalent, both carrying the same ASTM C936 rating as any KraftMaid-specified material but at a price we can write honestly on the quote.
Signs Your KraftMaid Driveway & Pavers Is Failing

- Pavers rocking underfoot or tire. The bedding sand has eroded or compacted unevenly, often from water pooling where the Ventura Boulevard-adjacent clay soils don’t drain fast after storms. Left alone, this stresses the paver itself and cracks follow.
- Weeds growing through joints. The joint sand has washed out completely or was never polymeric. In Sherman Oaks, where Santa Ana winds carry fine dust, traditional sand degrades faster than the manufacturer claims.
- Edge pavers tilting outward. The edge restraint - plastic, aluminum, or concrete - has failed from vehicle impact or frost heave on north-facing slopes. This is the first failure mode we check on every paver call.
- White haze or efflorescence. Calcium salts migrate to the surface when water sits too long beneath the pavers. Common on properties near the Los Angeles River floodplain where the water table runs higher than owners realize.
- Sinking near downspouts or irrigation heads. The base material has liquefied from chronic water exposure. In Sherman Oaks, this shows up within three to five years on installations where the contractor skipped the geotextile fabric layer to save labor.
Before
AfterReplacement Cost & What’s Included
| Service | Price Range in Sherman Oaks |
|---|---|
| Paver driveway installation (new) | $7,000 - $18,000 |
| Concrete driveway installation | $4,500 - $12,000 |
| Driveway replacement | $5,000 - $14,000 |
| Paver patio installation | $3,500 - $11,000 |
| Driveway sealing | $250 - $700 |
| Sectional paver repair (per 100 sq ft) | $800 - $2,200 |
| Edge restraint replacement (linear ft) | $12 - $28 |
| Polymeric sand reapplication | $1.50 - $3.50 / sq ft |
The range depends on three factors: how much base material needs recompaction, whether we can source the original paver color (discontinued runs require full-area replacement for match), and access - tight hillside driveways off Mulholland or Beverly Glen add labor hours. Every quote is flat and written before work starts, per Clause 1 of the Haven Standard. The 365-Day Done Right Promise covers settling, joint failure, or edge movement we should have prevented. We also pull permits when the project crosses into the public right-of-way, which Sherman Oaks requires for any driveway apron work touching the street.
DIY or Call Us?

What you can safely check: lift one paver at the edge and see if the bedding sand is still granular or has turned to mud. Check whether your edge restraint is still mechanically fastened or has pulled free. Photograph the paver brand stamp if you can find it.
Where DIY goes wrong: re-leveling pavers without recompacting the base in lifts means the same dip returns in six months. Polymeric sand requires precise watering - too little and it won’t set, too much and it leaves a haze that etches the paver face. And any work involving the curb cut or sidewalk approach needs a City of Los Angeles permit; unpermitted apron work gets red-tagged and redone at double the cost. We’ve seen it twice on Hillside Avenue properties in the past year.
Call (213) 221-0788 and we’ll send a crew with the right compactor plate and a written scope. Measure twice, write it down, then build it.
FAQs
Properly installed concrete pavers last 25-30 years in this climate, though the joint sand needs refresh every 5-7 years and sealing every 3-4 on south-facing exposures. The Santa Monica Mountains microclimate with its freeze-thaw cycles above 1,000 feet elevation shaves roughly 5 years off that lifespan if the base wasn’t engineered for drainage. Call (213) 221-0788 for an exact assessment - estimates are free.
Isolated settling can be fixed by lifting the affected area, regrading the base, and reinstalling the same pavers if they’re not cracked. When the failure is widespread - efflorescence throughout, multiple edge failures, or base saturation - partial replacement is more economical than repeated spot repairs. We document both options with photos so you can see the difference. Call (213) 221-0788 for a written comparison.
A standard 500-square-foot driveway runs 3-4 days: one day for removal and base prep, one for compaction and bedding, one for laying and cutting, and a half-day for joint sand and cleanup. Weather delays happen - we won’t seal or sand in rain, and Sherman Oaks gets just enough winter precipitation to push schedules by a day or two. We text confirmations, not promises.
We stock Belgard and Techo-Bloc’s standard color runs on our Sherman Oaks yard, plus polymeric sand in tan and grey. Custom-order pavers or specialty sizes take 2-3 weeks from the manufacturer. If your job is time-sensitive, we’ll confirm stock before you sign the scope, not after. Call (213) 221-0788 to check current inventory against your needs.
Rowan Construction Group Sherman Oaks is an independent service provider and is not affiliated with KraftMaid Corporation. We source compatible materials through our vetted supplier network.
Ready to price your paver repair or replacement? Call (213) 221-0788 to schedule your free estimate. We’ll bring a written scope, a photo documentation kit, and the flat price before anyone picks up a tool.
Written by Grant Rowan, Owner, Rowan Construction Group Sherman Oaks at Rowan Construction Group Sherman Oaks, serving Sherman Oaks and nearby areas.







Before
After
Before
After
Before
After