Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Mr-Glass Driveway & Pavers: The Sherman Oaks Owner’s Guide
We stock and install Mr-Glass-compatible driveway and paver components in Sherman Oaks, with typical installed repair and replacement work running $250-$1,800 depending on the scope. Most Mr-Glass paver resets, joint sand replenishment, and edge restraint repairs can be scheduled within 48 hours. Homeowners usually notice the failure first as shifting pavers after winter rains, or as a rattling sound when a vehicle crosses the driveway - the joint sand has washed out, or the edge restraints have pulled away from the bedding layer.
Which Mr-Glass Models This Applies To
Mr-Glass produces driveway and paver systems under several series lines, and the part you need depends on which generation was installed. The Residential Paver System (RPS) and Commercial Grade Paver (CGP) lines use different edge restraint profiles - the RPS uses a 1.5-inch aluminum L-profile, while the CGP series switched to a 2-inch PVC restraint in 2019. Check the stamped code on the paver edge or the original installation documentation; if neither is available, measure the joint width (RPS uses 3/16-inch joints, CGP uses 1/4-inch) and the paver thickness (RPS is 2 3/8 inches, CGP is 2 3/4 inches).
We source OEM Mr-Glass joint sand and edge restraints through our distributor network, and where OEM lead times stretch past two weeks, we specify equivalent-grade alternatives - polymeric sand with the same ASTM C-144 gradation, or PVC restraints with matching tensile strength - that we document in writing before installation. Rowan Construction Group Sherman Oaks is an independent service provider, not affiliated with Mr-Glass.
Signs Your Mr-Glass Driveway & Pavers Is Failing

- Pavers rocking or tilting underfoot. The bedding layer of crushed stone, called the base, has settled unevenly - often from water intrusion through failed joint sand. In Sherman Oaks, the clay-heavy soil near the Sepulveda Basin holds moisture longer than the hillside areas off Mulholland, so settlement patterns differ block by block.
- Weeds growing between pavers. The polymeric joint sand has degraded or washed out, leaving voids. Once roots establish, they accelerate the washout cycle by channeling water deeper into the base.
- Edge pavers pulling away from the border. The edge restraint has failed - either the spikes have rusted through (common with galvanized spikes in irrigated lawns) or the PVC has cracked from UV exposure after five-plus California summers.
- Standing water 30 minutes after rain. The base has lost its designed slope, or the pavers have heaved from expansive soil. Sherman Oaks sees this particularly where original installations skipped the geotextile fabric separation layer between native soil and base stone.
- Chalky white residue on paver faces. Efflorescence - mineral salts migrating through the paver body. It’s cosmetic, not structural, but it signals that water is moving through the system in ways the original design didn’t intend.
Before
AfterReplacement Cost & What’s Included
For Mr-Glass driveway and paver work in Sherman Oaks, our installed pricing breaks down as follows:
- Joint sand replenishment (polymeric, 500 sq ft typical): $250-$550
- Edge restraint replacement (linear foot, materials plus labor): $18-$32
- Base repair and paver reset (localized, up to 100 sq ft): $800-$1,400
- Full section removal, base rebuild, and paver reinstall: $1,200-$1,800
What drives the range: access (steep driveways off Beverly Glen require hand-carrying materials), the depth of base excavation needed, and whether the original Mr-Glass pavers are still available or we need to source matching replacements. Every quote is a flat written price with a written scope - under Clause 1 of the Haven Standard, the number is fixed before anyone picks up a tool. Our 365-Day Done Right Promise covers the workmanship, and the documented photo record shows you the base condition before we cover it back up.
DIY or Call Us?

An owner can safely check a few things: verify whether the paver is loose by hand (bedding sand issue) or firmly set but tilted (base issue), and look for the stamped model code on paver edges. What goes wrong with DIY is the compaction step - plate compactors rent for $80/day, but without knowing the proper lift thickness for your base material, you’ll get settlement within a season. Polymeric sand also requires precise activation: too little water and it won’t set; too much and it washes into the base, causing the very failure you’re trying to fix. For base rebuilds, we bring a jumping jack compactor and a laser level - the tools that make the difference between a repair that lasts and one that doesn’t. Call (213) 221-0788 to schedule your free estimate.
FAQs
Properly installed Mr-Glass pavers last 25-30 years in the San Fernando Valley climate. The bigger variable is the joint sand and edge restraint maintenance cycle - expect to refresh joint sand every 5-7 years and inspect edge restraints at the same interval. Call (213) 221-0788 for an exact quote on your maintenance needs - estimates are free.
Individual pavers can be lifted, the base re-leveled, and the same pavers reinstalled if the paver body is intact. We only recommend full replacement when the paver surface has spalled (flaked) from freeze-thaw cycling or when matching replacements are unavailable. Call (213) 221-0788 for an exact quote - estimates are free.
Joint sand replenishment on a standard two-car driveway takes one day. Base repair and paver reset for a localized area takes 1-2 days, including cure time for the bedding layer before final compaction. We schedule the work once the written price is accepted, not before. Call (213) 221-0788 to schedule your free estimate.
We stock polymeric joint sand and edge restraint profiles that match Mr-Glass specifications on our trucks. For paver replacements, we source from our distributor in Pacoima with a 2-3 day lead time for most RPS and CGP colors. Call (213) 221-0788 to confirm availability for your specific model - estimates are free.
Measure twice, write it down, then build it. That’s how we’ve kept projects within a few percent of the agreed price across 4,000-plus jobs since 2007.
Ready to get your Mr-Glass driveway fixed right? Call (213) 221-0788 to schedule your free estimate. We’ll review the site, identify the exact part and scope, and deliver a flat written price before any work starts - that’s Clause 1 of the Haven Standard, and it’s how we operate on every trade, every time.
Written by Grant Rowan, Owner, Rowan Construction Group Sherman Oaks at Rowan Construction Group Sherman Oaks, serving Sherman Oaks and nearby areas.







Before
After
Before
After
Before
After