Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cover Kitchen Remodeling: The Sherman Oaks Owner’s Guide
Cover kitchen remodeling in Sherman Oaks typically runs $14,000-$45,000 for a full project, with smaller refreshes starting around $9,000. We stock Cover-compatible cabinet lines, hardware, and fixture packages, and we can usually schedule a free estimate within 48 hours. Most Sherman Oaks homeowners realize their Cover kitchen needs attention when cabinet hinges start sagging, drawer glides stick, or the original laminate countertops show delamination along the sink edge after years of Valley heat cycling.
Which Cover Models This Applies To
Cover manufactured kitchen systems from the early 1990s through the mid-2010s under several series names, and the hardware specs shifted noticeably around 2004. If your cabinets have a foil-stamped code inside the door frame starting with “CV-” or “CS-“, you’ve got a post-2004 unit with the 35mm cup hinge and full-extension soft-close drawer boxes. Pre-2004 Cover used a 32mm hinge boring pattern and side-mounted roller glides that are now largely obsolete. The critical compatibility gotcha: Cover’s 2008-2012 “Studio” line used a proprietary 5/8″ side-wall thickness instead of the standard 3/4″, so standard replacement drawer boxes from KraftMaid or Wellborn won’t fit without shimming or custom fabrication.
We’re an independent service provider, not affiliated with Cover. For OEM hardware, we source through specialty distributors who still carry Cover’s original hinge plates and lift mechanisms. In most cases, though, we spec Blum or Salice aftermarket equivalents that match the hole pattern and exceed the original weight rating. The decision comes down to whether you’re replacing a single failed component or reconfiguring the whole layout. For single-part swaps, aftermarket saves two to three weeks of lead time. For full kitchen rehabs, we typically recommend migrating to current-standard cabinet lines from our vetted roster.
Signs Your Cover Kitchen Remodeling Is Failing

- Doors hang crooked or won’t stay closed. The original Cover hinge cups wear oval after roughly 12-15 years of daily use, especially in Sherman Oaks homes where seasonal humidity swings from 20% to 60% stress the fiberboard substrate. The door effectively loosens its grip on the frame, and no amount of screw tightening fixes stripped pilot holes in particle board.
- Drawers bind, stick, or fall off their tracks. Cover’s pre-2004 roller glides used a plastic wheel that crystallizes in dry Valley heat; post-2004 ball-bearing slides fail when lubricant gums with kitchen grease and dust. Either way, the drawer box starts racking, which wears the corner joints.
- Countertop seams darken or swell near the sink. The original Cover laminate installations often skipped a full backer-rod and silicone seal at the sink cutout. In Sherman Oaks, the combination of hard water and daily thermal shock from the faucet eventually breaches the particle-board core, causing the substrate to puff.
- Base cabinets feel spongy under the sink. Cover’s sink bases used a composite floor panel rather than plywood; any leak, even slow, wicks upward and compromises structural integrity. We find this most often in homes near the Sepulveda Basin where the water table runs higher and slab moisture migrates.
- Wall cabinets pull away from studs. Cover’s installation spec called for #8 screws into studs at 32″ centers, but many original installers hit only drywall with toggle bolts in the 1990s boom. Add the weight of stacked dinnerware and the thermal expansion of exterior walls facing Ventura Boulevard traffic, and the cabinet starts to drift.
Before
AfterReplacement Cost & What’s Included
| Component | Price Range (Sherman Oaks) |
|---|---|
| Full Kitchen Remodel | $14,000-$45,000 |
| Small Kitchen Refresh | $9,000-$20,000 |
| Cabinet Installation (new boxes) | $4,000-$13,000 |
| Countertop Installation | $2,000-$6,500 |
| Backsplash Installation | $800-$2,500 |
| Kitchen Island Installation | $3,000-$10,000 |
The spread on a full Cover kitchen remodel in Sherman Oaks comes down to three variables: whether we keep the footprint or move plumbing and gas, whether you select mid-grade KraftMaid or premium Wellborn with custom paint, and whether the substrate damage requires wall or floor repair before new cabinets go in. Our quote is a flat price with a written scope and a written warranty. Under Clause 1 of the Haven Standard, that written price is delivered before any work starts. No change proceeds without a signed change order, which is why our projects finish within a few percent of the agreed number. Every visit includes a documented photo record, standard, so you see what we found and what we did.
DIY or Call Us?

There’s a safe middle ground for Cover owners. You can check: are the screws loose (hand-tighten, don’t over-torque into stripped particle board), is the drawer simply off its track (lift and reseat), is the leak active or old stain (dry it and monitor). What goes wrong fast: drilling new hinge holes without a 35mm Forstner bit and proper depth stop blows through the door face. Attempting to level base cabinets on a sloping 1950s Sherman Oaks slab without a laser and shims creates a cascade where countertops crack and doors bind. And any work involving electrical relocation, gas line capping, or load-bearing wall evaluation needs permits and a licensed contractor. We’re state-licensed, insured and bonded, and we pull permits as part of the scope. Call (213) 221-0788 to schedule your free estimate.
FAQs
Cover cabinets installed before 2004 average 20-25 years in the San Fernando Valley climate; post-2004 units with better hardware and moisture-resistant substrates often reach 30 years if the sink base stays dry. The limiting factor is usually the particle-board core, not the door finish. Call (213) 221-0788 for an exact quote on extending the life or replacing - estimates are free.
Individual components, yes: hinges, drawer boxes, and pull-out hardware are all replaceable. But if the cabinet carcass itself is swollen, delaminated, or pulling from the wall, repair costs approach replacement without the warranty or layout improvement. We offer a free second opinion on any written estimate to help you compare honestly.
A typical Sherman Oaks Cover kitchen, keeping the existing footprint, runs 3-5 weeks from demolition to final walkthrough. Moving walls, relocating gas or plumbing, or custom cabinet lead times add time we build into the written schedule. Every phase is photo-documented and shared.
We stock common Blum and Salice hinge sets, drawer slide pairs, and pull-out hardware on our Sherman Oaks trucks. For Cover-specific OEM pieces or discontinued lines, we source through our distributor network and confirm compatibility against your unit’s stamp code before ordering. Call (213) 221-0788 to schedule your free estimate.
Measure twice, write it down, then build it. That’s how Grant Rowan has run every project since founding Rowan Construction Group in 2007, and it’s how we handle Cover kitchen remodeling in Sherman Oaks today. If your cabinets are showing their age, call (213) 221-0788 to schedule your free estimate. We’ll review your layout, check your substrate condition, and deliver a written price before anyone picks up a tool.
Written by Grant Rowan, Owner, Rowan Construction Group Sherman Oaks at Rowan Construction Group Sherman Oaks, serving Sherman Oaks and nearby areas.







Before
After
Before
After
Before
After