A Rowan company - serving Sherman Oaks, CA

Ameristar Fence Installation Nationwide

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Ameristar Fence Installation: The Sherman Oaks Owner’s Guide

Ameristar fence installation in Sherman Oaks typically runs $3,500-$9,000 for a complete residential system, with most projects quoted and scheduled within 48 hours. Rowan Construction Group stocks Ameristar-compatible components across multiple series and can source OEM or quality aftermarket equivalents depending on your panel style and height specification. Most Sherman Oaks homeowners discover their fence needs attention when posts lean after winter rains, gates sag on their hinges, or the black powder coat starts chalking along the south-facing sections near Ventura Boulevard.

Call (213) 221-0788

Which Ameristar Models This Applies To

Ameristar produces three residential fence series that we regularly encounter in Sherman Oaks: Montage (ornamental steel with flush-mounted pickets), Echelon (aluminum with narrower profiles for pool enclosures), and Somerset (wider-profile steel for perimeter security). The critical compatibility point is the post dimension, not just the panel height. Montage uses 2-inch square posts; Echelon and Somerset use 2.5-inch, and mixing post caps or bracket kits across series will leave you with a 3/8-inch gap that collects water and rusts from the inside out.

To identify your series, check the underside of the top rail for an embossed date code and gauge stamp. Ameristar switched from 18-gauge to 20-gauge pickets on some Echelon runs in 2019, which changes the bracket spacing. We stock both gauges, plus the older Montage II hardware that was discontinued in 2021. OEM parts carry the Ameristar finish warranty; quality aftermarket equivalents from SpecRail match the AAMA 2604 powder spec and cost 15-20% less. For properties in the hills above Mulholland, where wind load matters, we spec the heavier gauge regardless.

Signs Your Ameristar Fence Installation Is Failing

Two professional contractors installing upper kitchen cabinets during a home remodel
Signs Your Ameristar Fence Installation Is Failing
  • Posts lean or wobble at grade. The concrete footing has cracked or the post itself has rusted at the base, common in Sherman Oaks where clay-heavy soil expands against the post sleeve during our wet February-March cycle. Water sits in the gap between steel and concrete, accelerating corrosion from the inside.
  • Gate sags and the latch misses the strike plate. The hinge bolts have loosened or the frame has twisted under its own weight. Ameristar gates over 48 inches wide need a center drop rod for support; without it, the welded corner joints fatigue and the diagonal brace goes slack.
  • Powder coat chalks or flakes, especially on south and west exposures. UV degradation of the polyester topcoat after 8-12 years in San Fernando Valley sun. Once the coating is compromised, the galvanized substrate is exposed and rust follows within two seasons.
  • Rattling or popping sounds in wind. Picket-to-rail fasteners have backed out, or the tension bands on tension-wire runs have stretched. This is a pre-failure condition; the next Santa Ana event can throw a panel.
  • Corrosion blooming at cut ends or weld points. Factory coatings don’t always penetrate fully at mitered corners. In Sherman Oaks, where irrigation overspray hits fence lines regularly, these spots go first.
BeforeBefore
AfterAfter

Replacement Cost & What’s Included

Complete Ameristar fence installation in Sherman Oaks ranges from $3,500 for a 50-linear-foot Echelon pool enclosure to $9,000 for a 150-linear-foot Montage perimeter with automated gate and stone-column integration. The spread depends on three factors: panel series and height (4-foot vs. 6-foot), site conditions (slope, access, existing concrete removal), and hardware grade (standard latch vs. MagnaLatch for pool code compliance).

Every quote from Rowan Construction Group is a flat written price with line-item breakdown: panels, posts, concrete, hardware, and labor. Under Clause 1 of the Haven Standard, that price is fixed before work starts. No change proceeds without a signed change order, which is why our projects finish within a few percent of the agreed number. The 365-Day Done Right Promise covers workmanship; Ameristar’s limited lifetime warranty covers structural defects on OEM components. We pull permits when required by Los Angeles municipal code and pass inspection before final payment.

Component Price Range (Installed)
4′ Echelon aluminum panel, 6′ post spacing $45-$65 per linear foot
6′ Montage steel panel, 6′ post spacing $55-$80 per linear foot
Single walk gate with hardware $600-$1,200
Double drive gate with hardware $1,400-$2,800
Post replacement (existing footing sound) $180-$320 each
Post replacement (new footing required) $280-$450 each

DIY or Call Us?

Contractor installing a white stone countertop during a kitchen remodeling project.
DIY or Call Us?

There’s a short list of checks any homeowner can make safely. Verify your gate hinge bolts are tight with a socket wrench. Clear debris from the post base to expose any rust. Spray silicone on the latch mechanism if it’s sticking. These are observations, not repairs, and they tell you what to report when you call.

What goes wrong with DIY on Ameristar systems starts with the post setting. The hole depth in Sherman Oaks clay must account for drainage; a post set in a dry hole this week is a leaning post next February. Tension-wire gates require a come-along tool and knowledge of preload spec; overtensioned wire pulls the frame out of square. And any welding or cutting of powder-coated steel requires touch-up with Ameristar’s color-matched spray, which is not sold at retail. We carry it. For the full install, the tools alone (gas-powered auger, transit level, tension gauge) cost more than our labor line item. Call (213) 221-0788 and we’ll measure twice, write it down, then build it.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

FAQs

Need Construction help in Sherman Oaks? Licensed & insured · Written quotes before work starts response · free estimates
Call (213) 221-0788
Local Service Coverage

Request a Free Estimate in Sherman Oaks

Tell us what you need - Rowan Construction Group Sherman Oaks responds fast. No obligation.

When you send us your details, you acknowledge our Privacy Policy and authorize us to contact you by call, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Call Now - Fast Dispatch