Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Unilock Bathroom Remodeling: The Sherman Oaks Owner’s Guide
Unilock bathroom remodeling in Sherman Oaks typically runs $9,000-$28,000 installed, depending on whether you’re refreshing a guest bath or reconfiguring a master with waterproof hardscaping elements. We stock Unilock-compatible materials and can usually begin material procurement within 48 hours of a signed scope. Most Sherman Oaks homeowners discover their Unilock surfaces need attention when they notice efflorescence blooming through grout lines, or when a once-slip-resistant shower floor starts shedding its textured finish after years of hard Valley water exposure.
Which Unilock Models This Applies To
Unilock’s bathroom and wet-area product lines fall into three categories we regularly specify in Sherman Oaks: the Copthorne series (tumbled pavers used for shower floors and accent walls), the Richcliff line (smooth-faced slabs for vanity surrounds and tub decks), and the Tribeca Cobble range (smaller units for drainable shower bases). The critical compatibility gotcha is drainage slope: Copthorne installed before 2018 often came with a nominal 1/4-inch-per-foot fall that doesn’t meet current California Title 24 requirements for wet-area waterproofing. If your shower pan was built during that era, replacement means re-pitching the mortar bed, not just swapping surface units.
To identify your exact material, check the pallet stamp if you have leftover stock, or look for the laser-etched “U-LK” code on the unit edge. Richcliff prior to Series 3 used a 2cm thickness; current spec is 3cm, which changes your substructure math. We source OEM Unilock through authorized distributors in Pacoima and Sun Valley, though for wet-area applications we often specify Belgard or Techo-Bloc equivalents with comparable compressive strength (8,500 PSI minimum) and faster local availability. The decision hinges on whether you’re matching existing flooring or starting fresh.
Signs Your Unilock Bathroom Remodeling Is Failing

- White powdery residue on grout or paver faces. This is efflorescence, mineral salts migrating through the joint sand or mortar bed. In Sherman Oaks, our calcium-heavy municipal water accelerates this; it means your waterproof membrane behind or below the Unilock has compromised, or the weep holes in your shower pan are clogged with debris.
- Loose or rocking pavers underfoot. The bedding sand has washed out or the mortar bed has delaminated from the substrate. On second-story bathrooms common near the Galleria corridor, this often traces to inadequate deflection rating in the original subfloor, 2×10 joists spaced at 24 inches on center rather than the 16 inches modern tile and paver specs demand.
- Discoloration that doesn’t clean with standard stone cleaner. Unilock’s color-through manufacturing means surface fading is rare; persistent dark spots usually indicate organic growth in the joint cavities, which happens when the polymeric sand degrades and traps moisture against the Valley’s warm stucco walls.
- Grout joints cracking in a straight-line pattern. This follows movement in the substrate, not the Unilock itself. In Sherman Oaks homes built on the expansive clay soils near the Los Angeles River basin, seasonal swelling and contraction stress rigid hardscape installations that weren’t built with expansion joints at proper intervals.
- Slippery surface despite original texture. The micro-abrasive finish has worn flat, typically from aggressive cleaning products or from hard water scale filling the texture cavities. This is a safety issue in wet areas and means the material has reached end of functional life even if structurally sound.
Before
AfterReplacement Cost & What’s Included
| Scope | Price Range in Sherman Oaks |
|---|---|
| Partial Unilock shower floor replacement (up to 40 sq ft) | $3,500-$7,500 |
| Full guest bath Unilock hardscape + waterproofing | $9,000-$16,000 |
| Master bath reconfiguration with new drain layout | $16,000-$28,000 |
| Subfloor reinforcement for paver installation (per project) | $1,200-$3,800 |
The range reflects three variables: demolition depth (surface-only versus full mortar bed removal), subfloor condition once exposed, and whether we’re matching discontinued Unilock colors that require custom tinting or sourcing from remnant lots. Under Clause 1 of the Haven Standard, your written quote itemizes each of these before work starts. The price includes permit pulling through the City of Los Angeles, a bonded waterproofing warranty through Laticrete or Mapei systems we specify, and our 365-Day Done Right Promise on installation workmanship. No change order gets executed without your signature, which is how we’ve kept projects within 3% of original quotes across 4,000 jobs since 2007.
DIY or Call Us?

There’s a honest line here. A homeowner can safely check whether drain covers are clogged with hair or whether joint sand needs refreshing, both of which mimic Unilock failure symptoms. What you shouldn’t attempt: removing pavers to inspect the mortar bed, cutting new units with a wet saw without dust suppression, or re-pitching a shower pan. The waterproofing layer beneath hardscape is a single-point failure system, one tear and you’re looking at subfloor rot, mold amplification in Sherman Oaks’ warm wall cavities, and a project that doubles in scope.
We carry moisture meters and core samplers on every truck. If you’re unsure whether the problem is surface or systemic, call (213) 221-0788 and we’ll schedule a diagnostic visit with documented photos, no charge for the assessment. Measure twice, write it down, then build it.
FAQs
Properly installed Unilock in a dry bathroom application lasts 25-30 years; in wet areas with our local water hardness, expect 15-20 years before surface texture degradation or joint failure. Call (213) 221-0788 for an exact quote on replacement, estimates are free.
Individual paver replacement is possible if you have matching stock, but efflorescence or membrane failure always indicates a systemic issue that surface repair won’t solve. Call (213) 221-0788 for an exact quote on replacement, estimates are free.
A guest bath typically takes 5-7 working days; a master with custom layout adds 3-5 days for curing time between waterproofing coats and mortar bed sets. Call (213) 221-0788 for an exact quote on replacement, estimates are free.
We stock Copthorne and Richcliff Series 3 in our Pacoima warehouse; discontinued colors or Tribeca Cobble specialty orders run 2-3 weeks from Unilock’s Ontario, CA distribution center. Call (213) 221-0788 for an exact quote on replacement, estimates are free.
Written by Grant Rowan, Owner, Rowan Construction Group Sherman Oaks at Rowan Construction Group Sherman Oaks, serving Sherman Oaks and nearby areas.







Before
After
Before
After
Before
After